UK government support for EV chargepoints is currently available through five Office for Zero Emission Vehicles (OZEV) schemes. The relevant route depends mainly on where you park and whether you are applying as a resident, landlord, workplace or eligible education institution.
For most current schemes, the headline contribution is up to £500 per socket. The important exceptions are state-funded education institutions, which can receive up to £2,000 per socket, and older education vouchers issued under previous rules, which may retain a higher value.
For residents and landlords using the newer application route, the key rule is straightforward: do not have the chargepoint installed before OZEV confirms that you are eligible. Installing first can put the grant at risk.
Last updated: 8 October 2026
The present five-scheme OZEV chargepoint grant portfolio is funded until 31 March 2027. That is the stated end date for current funding, rather than a promise that every scheme and rule will remain unchanged until then. The government reserves the right to amend or end schemes, while saying it will aim to give four weeks’ notice and honour qualifying claims made before a public announcement.
Which EV charger grant may apply to you?
- You rent a house or flat and have private off-street parking: the grant for renters and flat owners may be the relevant route.
- You own and live in a flat with private off-street parking: the same renters and flat owners grant may apply.
- You only have on-street parking: consider the households with on-street parking grant, where a cross-pavement solution is required.
- You are a landlord or manage residential property for a landlord: the residential landlord chargepoint grant may be appropriate.
- You are arranging chargers at a business, charity or public-sector workplace: look at the Workplace Charging Scheme.
- You represent a state-funded education institution: a separate education-institution route may be available.
These are headline signposts, not the complete eligibility tests. Before committing to an installer or equipment, check the full current scheme conditions for the specific grant you intend to use.
Grants for renters and flat owners
The electric vehicle chargepoint grant for renters and flat owners offers up to £500 towards installation. It is aimed at people who either rent and live in a residential property, or own and live in a flat, where they have private off-street parking.
This makes the scheme particularly relevant where a resident wants a charger at an allocated bay, a driveway or another parking space that is not part of general on-street parking.
Who this route is likely to suit
- A tenant renting a house with a private driveway.
- A tenant in a flat with a private allocated parking bay.
- An owner-occupier of a flat with private off-street parking.
Having a suitable space is not the only consideration. Renters should establish what consent is needed from their landlord, while flat owners should consider whether the parking area, building fabric or electricity supply is controlled by a freeholder, managing agent or residents’ management company. Those property arrangements can affect whether an installation is practical even where the grant route appears relevant.
Application process for residents
Since 1 April 2026, applications for the renters and flat owners grant have been made through a new platform accessed by selecting Start new application on the relevant guidance page. OZEV notifies both the applicant and installer by email if eligibility is confirmed.
OZEV initially estimates that applications and claims on the platform can take up to 10 working days to assess. Treat that as an estimate, not a guaranteed approval or payment timetable.
Support for households with on-street parking
Households that own or rent their home but have only on-street parking may be able to seek up to £500 towards installation through the on-street parking grant.
The scheme requires a cross-pavement solution, such as a charging gully. It is designed for the different practical problem faced by residents who cannot park on a private driveway or bay.
Do not confuse on-street and off-street routes
A common mistake is to focus only on whether a person owns or rents their home. Parking arrangements matter just as much. A household with private off-street parking may fit the renters and flat owners route, whereas a household with only on-street parking should investigate the cross-pavement route instead.
Do not assume that a cable laid across a pavement is an acceptable substitute for a suitable cross-pavement installation. The grant description specifically refers to a cross-pavement solution, and the full scheme requirements should be checked before work is planned.
Residential landlord chargepoint grant
The residential landlord chargepoint grant is available to eligible private landlords, property management companies acting for a landlord, registered providers of social housing and eligible public-sector organisations.
It provides up to £500 per socket. A landlord can apply for funding for up to 200 sockets across all sites.
This route is intended for residential parking provision rather than a landlord’s own office or commercial premises. It can be relevant to a landlord with several properties, a block manager arranging charging at residential sites, or a social housing provider planning installations for residents.
Landlord application timing matters
Landlord applications also moved to the new platform from 1 April 2026. As with the resident route, installation must not take place until OZEV has confirmed eligibility. This should be built into project planning, especially when work involves multiple properties, shared parking areas or contractor scheduling.
For claims under the new arrangements, installers must provide photographs of the completed installation. These include images showing the installed chargepoint, its model and serial number, the chargepoint with its associated parking space, and a wider view of the building or installation area.
Workplace Charging Scheme
The Workplace Charging Scheme is open to eligible businesses, charities and public-sector organisations. It provides up to £500 per socket, with support available for up to 40 sockets across all sites.
This is the main current workplace route for organisations installing chargepoints for their premises. The limit is across an organisation’s sites, so employers with more than one location should plan applications with that overall cap in mind.
Businesses looking to improve their online presence can build a website with DM Site Builder.
For eligible workplace installations completed from 1 April 2026, the £500 maximum applies regardless of when the organisation applied for the grant. Workplace funding is currently available until 31 March 2027.
Practical workplace planning
Before applying, decide what the charging spaces are for and where they will sit in the car park. For example, an employer may be considering staff charging, visitor spaces or a mixture of both. A clear plan helps avoid selecting equipment or parking locations before the organisation has considered access, site operations and future demand.
It is also sensible to confirm who will administer the application, liaise with the installer and retain records. Larger sites may involve facilities teams, landlords, managing agents or electricity-supply stakeholders as well as the organisation seeking the grant.
Education-institution chargepoint support
State-funded education institutions are included in the current five-scheme grant portfolio. The available support is up to £2,000 per socket.
There is a transitional point worth noting. Education vouchers awarded for applications submitted before 1 April 2026 remain valid at up to £2,500 per socket. That is a legacy arrangement for qualifying earlier applications; it does not mean new applicants can expect the former higher amount.
Grant amounts and limits at a glance
- Renters and flat owners: up to £500 towards installation; residents can apply for one socket.
- Households with on-street parking: up to £500 towards installation.
- Residential landlords: up to £500 per socket; up to 200 sockets across all sites.
- Workplaces: up to £500 per socket; up to 40 sockets across all sites.
- State-funded education institutions: up to £2,000 per socket.
“Up to” is important. These figures are maximum grant contributions or rates, not a statement that every installation will receive the maximum amount or that funding will meet every cost associated with a project.
How to avoid the most common mistakes
1. Choosing the wrong scheme because of your home type
Flat owners and renters with private off-street parking are covered by one route; households with only on-street parking should examine the cross-pavement route. Start with parking, then work out the appropriate applicant category.
2. Booking installation before eligibility is confirmed
This is the most important timing error for the flats, renters and residential landlord schemes. Wait for OZEV’s eligibility notification before the chargepoint is installed. Your installer is notified at the same time.
3. Treating an assessment estimate as a deadline
The initial estimate of up to 10 working days is useful for planning, but it is not a guarantee. Avoid arranging work on the assumption that a decision will arrive by a particular date.
4. Using outdated scheme names or routes
The previous grant-management portal is no longer a live customer application route. It closed to customer applications on 31 March 2026. Do not rely on old online guides, archived screenshots or advice referring to the former portal process.
5. Applying for a closed grant
The staff and fleets grant, commercial landlord chargepoint grant and residential landlord infrastructure grant closed to new customer applications on 31 March 2026. They should not be treated as alternatives for a new application in October 2026.
6. Leaving evidence to the last minute
For relevant new-platform claims, installers need specified photographs of the finished installation and surrounding area. Discuss this evidence requirement before work starts, so the necessary images can be captured properly once the charger is in place.
A simple decision checklist
- Identify the parking arrangement. Is it private off-street parking, or only on-street parking?
- Identify the applicant. Are you a resident, landlord, property manager, workplace organisation or education institution?
- Match the appropriate current scheme. Do not use a closed legacy grant as a guide to current eligibility.
- Check the full live conditions. Headline funding and broad eligibility do not replace the detailed rules.
- Choose an installer and discuss the evidence needed. This is especially important for applications made through the newer platform.
- Apply before installation where required. For the renters, flat owners and residential landlord routes, wait for OZEV’s eligibility confirmation.
- Keep project timing flexible. Allow for the stated assessment estimate without assuming a guaranteed decision date.
Frequently asked questions
Can a renter get help with an EV charger?
Potentially, yes. A renter who lives in a residential property and has private off-street parking may be eligible for the renters and flat owners grant, which offers up to £500 towards installation. Property permissions may still need to be addressed separately.
Can I get a grant if I park on the street?
There is a separate grant for households with only on-street parking. It offers up to £500 and requires a cross-pavement solution, such as a charging gully.
How much can a landlord claim?
An eligible residential landlord can apply for up to £500 per socket, up to a maximum of 200 sockets across all sites.
How much can a workplace claim?
Eligible businesses, charities and public-sector organisations can receive up to £500 per socket through the Workplace Charging Scheme, for up to 40 sockets across all sites.
Can I install the charger and apply afterwards?
For the flats and renters grant and the residential landlord chargepoint grant, no: OZEV says the chargepoint must not be installed until it has notified the customer that they are eligible. The installer is notified at the same time.
Are EV charger grants guaranteed to stay open until March 2027?
Current funding for the five-scheme portfolio is stated to run until 31 March 2027. However, the government can change or end the schemes earlier, subject to its stated approach to notice and qualifying existing claims. Check the live scheme guidance immediately before applying or arranging work.
Related DM News
Thanks for visiting DM News! If you’ve got a question, a story tip, or anything you’d like to share, head over to DriverMatty.com — I love to hear from you. While you’re there, don’t forget to check out my other websites and social media channels.






