NATS has identified a previously unknown legacy software fault behind the major air traffic disruption on 8 September that affected airlines, airports and passengers across the UK.
In a preliminary report published on 18 September, the air navigation service provider said the fault was in a National Airspace System software module used to allocate or reassign aircraft squawk codes. The findings are preliminary, and NATS’ full major-incident investigation remains in progress.
NATS said the request that triggered the event was valid and had been made correctly. It was interrupted when the system processed a higher-priority task. The defect could be triggered only if that higher-priority request arrived during an exposure window of about one millisecond, while the original update was incomplete.
The interrupted process produced corrupted flight data. This later generated repeated loss-of-connection notifications between London Area Control and the National Airspace System. Controllers lost access to some live flight data and had to carry out some work manually under established fallback arrangements.
The disruption centred on London Area Control, which principally manages higher-level traffic above 24,500 feet over England and Wales. Restrictions were applied more widely to allow the system to be recovered.
Traffic restrictions began affecting airlines, airports and passengers from 12:45 on 8 September. UK departures were stopped at points during the incident, while arrival limits were imposed at some airports. The cumulative time during which airport departure stops were in place was about four and a half hours across a six-hour period. All airspace restrictions were lifted at 19:30.
Passengers planning airport journeys can compare pre-booked options with DM Airport Transfers.
NATS estimated that more than 2,000 flights were delayed, cancelled or diverted. It handled 6,094 flights that day, compared with an expected total of around 8,000.
NATS said aircraft remained safely separated throughout the incident and that safety margins were maintained. It restarted the system and reconciled unsynchronised flight-plan data before full air-traffic-control restoration at 18:50.
A software correction has been delivered by the supplier and is being tested and safety-assured before deployment. NATS has also introduced additional engineering and reporting arrangements to manage any further link-drop event more rapidly while the permanent correction is being deployed.
The preliminary report says the incident was not related to the August 2023 flight-planning outage or the radar issue in July 2025. NATS said there was no evidence at this stage of a malicious or cyber-related cause.
The full major-incident investigation is due within 60 days of the 8 September event. It will examine the root causes, system resilience, NATS’ response and communications.
Thanks for visiting DM News! If you’ve got a question, a story tip, or anything you’d like to share, head over to DriverMatty.com — I love to hear from you. While you’re there, don’t forget to check out my other websites and social media channels.